MockExams

Change of Order of Integration & Change of Variables via Jacobians

AI draft, not yet reviewedUnit 1: Multiple IntegralsAbout 3 minutes

Idea in plain words

Change of Order of Integration: Reverses the sequence of iterated integration from to (or vice-versa), converting impossible non-elementary antiderivatives into easily solvable forms.

Exam tip

High-yield exam topic (Very High).

Explanation

Many practical definite integrals (such as ∫ (sin y / y) dy or ∫ e^{-x²} dx) have no elementary antiderivative. By changing the order of integration, the non-integrable variable becomes the outer parameter, yielding an inner integrand of 1 that integrates trivially. When transforming coordinate geometries (e.g., from skewed parallelograms to unit squares), the Jacobian determinant measures the local surface area distortion factor |dA_{xy} / dA_{uv}|.

Key points

  • Procedure: (1) Extract existing boundary equations from integral limits, (2) Sketch the exact 2D bounded region , (3) Switch perspective from vertical strips to horizontal strips (or vice-versa), (4) Determine new inner variable limits as functions and outer limits as constants.
  • Change of Variables in Double Integrals: .
  • The Jacobian Determinant: .
  • Inverse Jacobian Property: , meaning .
  • Polar Coordinate Transformation: , Jacobian .

Code examples

// Change of Order of Integration: Classic University Exam Proof
// Evaluate: I = ∫_0^a ∫_{x/a}^{√(x/a)} (x^2 + y^2) dy dx
// Step 1: Identify existing boundary curves:
//    Inner limits: y = x/a (straight line x = ay) to y = √(x/a) (parabola x = a y^2)
//    Outer limits: x = 0 to x = a
// Step 2: Points of intersection:
//    ay = ay^2 => ay(1 - y) = 0 => y = 0 and y = 1.
//    At y = 0, x = 0. At y = 1, x = a.
// Step 3: Draw horizontal strips across region R:
//    For a fixed y ∈ [0, 1]:
//    Left boundary curve (enters):  x = a y^2
//    Right boundary curve (exits): x = a y
// Step 4: Rewritten integral with changed order:
//    I = ∫_0^1 [ ∫_{a y^2}^{a y} (x^2 + y^2) dx ] dy
//      = ∫_0^1 [ (x^3 / 3) + y^2 x ]_{a y^2}^{a y} dy
//      = ∫_0^1 [ (a^3 y^3 / 3 + a y^3) - (a^3 y^6 / 3 + a y^4) ] dy
// Step 5: Integrate with respect to y:
//    = [ (a^3/3 + a) (y^4 / 4) - (a^3 / 21) y^7 - (a / 5) y^5 ]_0^1
//    = (a^3 / 12) + (a / 4) - (a^3 / 21) - (a / 5)
//    = a^3 (1/12 - 1/21) + a (1/4 - 1/5) = (3 a^3 / 84) + (a / 20) = (a^3 / 28) + (a / 20)

Exam questions

  • [8 Marks] Change the order of integration and evaluate ∫_0^1 ∫_x^1 [x / (x² + y²)] dy dx.
  • [8 Marks] Change the order of integration of ∫0^4a ∫{x²/4a}^{2√(ax)} dy dx and evaluate.
  • [7 Marks] Transform to polar coordinates and evaluate ∬_R √(a² - x² - y²) dx dy over the positive quadrant of the circle x² + y² ≤ a².
  • [7 Marks] Find the Jacobian ∂(u, v)/∂(x, y) if u = (x² - y²) / 2 and v = xy.

BIT151HS

Switch Course

Unit 1: Multiple Integrals

Unit 2: Differential Equations of the First Order

Unit 3: Linear Differential Equations with Constant and Variable Coefficients

Unit 4: Fourier Series and Integrals

Unit 5: Functions of a Complex Variable

Unit 6: Complex Series, Residues and Poles

On this page

Past Exam Questions

Not asked in past exams yet

This topic hasn't appeared in previous exam papers.

Search BIT151HS

Reading

Theme
Reading mode
Text size
Default
Font
Line width
Line spacing